What crosses the property line, and what does not.

A plain diagram of how each center is designed to run.

Simplified concept diagram of an E.F. Data Center The community water supply is not used for cooling. The community grid connection is kept for backup. Natural gas is the fuel for onsite linear generators. The generators and supercapacitor storage are designed to feed a grid-interactive inverter. The inverter is designed to power the data center equipment. An inner water loop is designed to cool the equipment. Community Center site · behind the meter Property line No draw for cooling For backup Inner water loop Patented Community water supply Not used for cooling Community grid Kept for backup Natural gas Fuel for onsite power Supercapacitor storage Non-lithium Grid-interactive inverter UL 1741 SB Linear generators Designed for under 70 dBA Data center equipment
Concept diagram, not an engineering drawing. Solid lines show how a center is designed to run in normal conditions. The dashed line is backup.
  • Community water supply

    Not used for cooling

    Cooling is designed to run on a patented inner water-looping system instead.

  • Community grid

    Kept for backup

    Each center is designed to run on its own power in normal conditions.

  • Natural gas

    Fuel for onsite power

    It fuels linear generators designed to run under 70 dBA at 3 meters.

Contact

Talk with us.

For municipal and community leaders

A community briefing for your council, planning staff, or residents.

Request a briefing